Services
Differences between SIRS and Traditional Reserve Study
Structural Integrity Reserve Study
- Required for 3+ story condos
- 8 specific structural items
- An engineer, architect or RS (certified Reserve Specialist) must inspect the site
- Funding required (not waived or pooled)
- Required to be completed for ALL 3+ story residential condos by December 31st, 2024
- Required every 10 years
Traditional Reserve Study
- All building types - no requirements
- Structural and non-structural items
- Anyone can inspect the site
- No funding requirements
- No timeline requirements


Structural Integrity Reserve Study (SIRS)
Law-compliant report allocating for reasonable repair, not necessarily full replacement. Engineering Included.
Request A Quote
×
Request A Quote
"*" indicates required fields
The 8 items included in the Structural Integrity Reserve Study (SIRS)
- Roofing
- Load-bearing walls and other primary members
- Fireproofing and fire protection
- Plumbing
- Electrical
- Waterproofing and exterior paint
- Common-area windows & doors
- Any structural items over $10,000


Traditional Reserve Study
Our plan keeps your communities beautiful, and your pockets full.
Request A Quote
×
Request A Quote
"*" indicates required fields



SIRS & Traditional Reserve Study
If you’re forced to do a reserve study on 8 items, why not get a discounted 2-in-1 report for the whole community?
SIRS and Traditional Reserve Study combined into one.
Request A Quote
×
Request A Quote
"*" indicates required fields
Frequently Asked Questions
No. Starting January 1, 2025, SIRS reserves cannot be waived or reduced by membership vote. Every association must fund reserves at least to the baseline level.
Traditional reserve components may be waived with a membership vote.